However venture pursuit he am mr cordial. Forming musical am hearing studied be luckily. Ourselves for determine attending how led gentleman sincerity. Valley afford uneasy joy she thrown though bed set. In me forming general prudent on country carried. Behaved an or suppose justice. Seemed whence how son rather easily and change missed. Off solicitude inhabiting projection apartments invitation are unpleasant solicitude fat motionless interested solicitude.







End of Content.
Our Newest Projects
Iron Bridge – Concentrate Handling Facility (1550t) CHF
Construction of CHF plant to dewater received slurry from Iron Bridge mine, transfer Magnetite onto existing material handling circuit, and pump Process Water back to IB mine.
Management of overseas fabrication of 6 x module pipe racks, transport and installation sequence.
Management of installation of 8 x dewatering belt filters, 4 x Agitated Filter Feed Tanks and 50m Concentrate Thickener.
Liaise with HP Slurry pipeline and Return Water pipeline construction teams to confirm scope interface.
Canyon G (1650t) at FMG Anderson Point
Upgrade of existing Iron Ore stockyard and associated material handling and shipping infrastructure.
Building 3 x new conveyor belts, a new Transfer Station and a new Sample Station.
Brownfield works on existing conveyors to receive Ore from Iron Bridge mine.
BHP Jimblebar Iron Ore – NPI Dewatering – Surplus Water Phase 1 Asset Project
Building of a new Pump Station at WH5/6 using existing Turkeys Nest.
Trenching and Installation of 7k 630OD HDPE pipeline to HASHI.
Building new Turkeys Nest and Pump Station at HASHI area.
Trenching and Installation of 12k 800OD HDPE pipeline to Caramulla Creek.
Installation of 3 x MAR Bore Spurlines.
Installation of 3 x MAR Bore Re-injection Headwork skids.
Installation of MSCL Creek Discharge Line.
Albemarle Kemerton Lithium Plant (KLP)
Steel fabrication of steel structure and steel pipes for Train 1, Train 2 and Common area.
Management of local and overseas sub contracts.
CLAHDO Upgrade Project
CLA High Density Ore Conveyors and Drives Upgrade Project at Cape Lambert
Mungari – Future Growth Project
WA gold mine set to double capacity after $250m expansion gets green light
Mungari Future Growth Project to increase gold production to 4.2mtpa (instead of current production 2mtpa)
Iron Bridge – Stacker SK705
Management of Thyssenkrupp Stacker SK705 construction works including structure, mechanical assembly, and piping.
Ongoing technical support during completion and No-load commissioning.
Organising construction punchlisting walkdowns and confirm working plan to close out.
CBH Group Proprietary Equipment & CLS Stackers
Manage the fabrication and assembly of Trippers, Head-Drives and Sloping Tails for CLS Stackers (New & Refurb)
Tianqi Lithium Australia (TLA) – Lithium Hydroxide Processing Plant (LHPP)
Installation in Leaching area including Rubber (HDPE) Lined, PE & SS pipes.
SMP installation of Hydro area and pipe rack. Preparation of hydro test packs, As-built drawings, sign off ITPs and FICs for MDR.
Total Uganda Oil Processing Facility (Greenfield FEED)
Lead of Gas Compression, Heating Medium and Flare units of the processing train (North).
Optimised steel and pipe work in Fuel Gas area to help to reduce construction & installation cost.
Peru LNG Service Order 01, 09, 12, 15, and 16 (Brownfield FEED & Detail)
• Man-hours estimate for engineering activities and associated resources Man-Power Plan (MPP)
• Chose the optimum locations of the piping Tie-in points on the existing systems
• Issued final piping MTO report and as-built isometrics for existing piping to show required modifications
Talisman Montrose BLP Offshore (Detail)
Piping stress analysis calculations for critical lines.
Goldboro LNG (FEED)
Responsible for Equipment Layout and Piping Design within Acid Gas Removal Unit (AGRU)
Piping stress analysis & pipe support selection for Propane Refrigerant (PR) & Mixed Refrigerant (MR)compressor lines
Rio Grande LNG (FEED)
Responsible for Equipment Layout and Piping Design within Natural Gas Liquids(NGL) Unit.
BG Tanzania LNG (Greenfield pre-FEED)
• Developed and optimised plant layout of the 2 liquefaction trains in project’s phase 1
• Prepared layout options/studies for client’s review to choose the optimum configuration for project’s future construction plan to add 2 liquefaction trains in phases 2 & 3
• Applying procedures, rules and regulations to ensure having safe and clean working environment
Statoil’s Mariner Area Development offshore (EPC)
Responsible for project’s PDMS piping Catalogues & Specifications Administration.
Loading of initial piping cats & specs database at project start-up.
Nubaria III Combined Cycle Power Plant 750 MW (Detail)
Nubaria III Combined Cycle Project consists of one module 750 MW (nominal). The module includes two 250 MW (nominal, ISO) combustion turbine generators (CTGs), each feeding exhaust gases to its respective unfired heat recovery steam generator (HRSG) with no supplementary firing.
El-Tebbin I & II Thermal Power Plant 2×350 MW (Detail)
The facility is designed to include a 2×350 MW Thermal Power Plant for interconnection to the National Unified Power System (NUPS) through the new GIS 220 KV switchyard facility.
Cairo West IIV & IIIV Thermal Power Plant 2×350 MW (Detail)
The facility is designed to include a 2×350 MW Thermal Power Plant for interconnection to the National Unified Power System (NUPS) through an extension of the existing GIS 500 KV Switchyard facility.
Egyptian Fertilizers Company I & II Revamp (Brownfield FEED & Detail)
“FEED” Piping Studies and Selecting Tie-in’s locations on existing lines.
Plant layout including equipment location, orientation, and pipe racks design.
“Detail” Piping design and pipe support selection according to UHDE standards.
Piping stress analysis & pipe support for critical lines.
A Passion For Quality
At RGH Engineering, quality isn’t just a goal — it’s the foundation of everything we build. Our passion for precision, safety, and innovation drives us to deliver results that stand the test of time. From planning to project completion, we ensure every stage meets the highest international standards.
We combine modern engineering solutions with hands-on expertise to create projects that perform efficiently and sustainably. With a team committed to excellence, we continue to raise the bar in design, construction, and client satisfaction across every industry we serve.
Get Daily News with Us!
Stay informed with the latest updates, insights, and industry news from RGH Engineering — where innovation and expertise meet every day.